Tag Archives: Limerick line

railflood

Iarnród Éireann’s Limerick to Ennis line is closed due to flooding for approximately SIX weeks.

A spokesperson writes:

The Limerick/Ennis line has flooded following a significant increase in water levels at Ballycar Lough due to the recent sustained heavy rainfall, and the slow draining nature of the karst landscape in the area. Should the recent rainfall patterns persist, this will extend significantly the duration of the closure of the rail line.  Iarnród Éireann had raised the track level by 60 centimetres at Ballycar in 2003 to mitigate against the effects of flooding. However, the current flood levels are at least 50 centimetres over the rail head and rising.

Flooding: Bus transfers between Limerick and Ennis to continue for weeks (Iarnród Éireann)

Pic: Iarnród Éireann