It’s Been Emotional

at

Slab

April, 2013

plinth

Today

You’ll recall the slab of concrete that was built as a ‘traffic calming measure’ at Dame Street and Lord Edward Street outside Dublin Castle.

It was built without planning permission at a cost of €15,000. In April, The Sunday Times reported it would cost €4,000 to be destroyed.

Wahey.

Previously: Slab City

Pretty In Plinth

Via Caroline Kennedy